|
To quicken construction on infrastructure facilities is the foundation of development, intensify eco-environment protection and construction is the essential of development, readjust industrial structure is the key of development, develop education on science and technology and hasten talent training is an important condition for development, deepen reform and expand opening is a strong power for development, highlight key works, favor superior and support strong items as well as cultivate new sectors and industrial power house is the approach to the development.
In the first decade in the 21st century, it is predicted that the fixed-asset investment for the whole society will hit 900 billion RMB Yuan. During the ??tenth five-year plan??, It is predicted that the fixed-asset investment for the whole society will come to 420 billion RMB Yuan or so, including construction of 70 key projects in infrastructure facilities, eco-environment and industrial development, with a total investment of some 100 billion RMB Yuan.
(I) Intensify construction on infrastructure facilities, with water conservancy, traffic and telecommunication as a focus.
1. Construction on water conservancy: By the year 2010, a group of trans-valley diversion works will have been built, urban water supply in Urumqi and Karamay solved fundamentally, land reclaimed along the diversion works, quick?Cgrowth forest constructed---base for commercial wood pulp and cows and green passages formed. The rich water and soil resources will have been fully utilized in Ili valley area, .18mu of land reclaimed, animal husbandry developed, production bases of fine wool, meat and dairy built, trans-valley diversion works completed to check basically the ecological worsening situation in the Aybi Lake area. In the upper reaches of the Tarim River Valley, The downhill land, Brunkou-Konggur water conservancy pivot, the Da Shixia Water conservancy pivot, the comprehensive control and protective works of the Tarim artery and the water conservancy pivotal works on Kenciwart and Kangjiashimenzi will have been completed so as to make the water resources in some main rivers get efficiently developed and properly utilized. During the ??Ten-five-year plan??, while water-conservancy backbone works being constructed, underground water will be developed, 10,000 wells constructed or reformed with digging machines and underground water tapping volume increased to 1.4 billion cubic maters, 50,000 kilometers of anti-seepage canal built, the utilizing coefficient of canal system increased from 0.47 to 0.55 so as to intensify our efforts in developing water-saving irrigation as a revolutionized measures. High-level water saving irrigation in a large scale is to be developed, spraying and dripping irrigation as well as other advanced irrigation technology are to be diffused in an all?Cround way, to expand water-saving irrigation area to 8 million mu and promote the big readjustment of horticultural structure through water-saving irrigation. By the year 2005, efforts will be made to enable the total amount of water resources to hit 500 hundred million cubic meters, 34 major irrigated-area water-conservation matching and reforming works in a attempt to fulfill the flood-control works in major rivers.
|